Land development near the Devyatkino metro station continues at an accelerated pace. This time, the Mystery Shopper, on the instructions of the site's editors, went here to check the Colors of Summer residential complex. This is a large-scale project that is being built by Polis Group, about 1.5 km from the metro.
What will happen?
So far, there is detailed information about the first stage of the Colors of Summer residential complex, which will consist of five 19-storey buildings designed for 2445 apartments. In the future, there will be other queues, in total, 19 houses will appear within the framework of the project.
Now houses 1, 2 and 5 are on sale, they are promised to be completed by the end of 2016. Buildings 3 and 4 will be released to the market of new buildings in the Leningrad region later, while it is impossible to say for sure whether their delivery date will be the same or more distant. The entire complex is planned to be completed by 2020.
Cases 1 and 2 are rectangular in shape, 3, 4 and 5 resemble the letter "V" in plan. The second house will have a built-in Kindergarten uk, and a dance school will open in building 5. Each house has a concierge and wheelchair rooms. Otherwise, this is a fairly typical economy class project with a predominance of small apartments and an open courtyard area.
The first stage of construction does not provide for parking. Perhaps it will appear later, or maybe not, this issue has not yet been resolved. Open parking spaces are provided, but, of course, they are few, as is usually the case.
According to the project declaration, the completion of the construction of the first stage is planned for the 1st quarter of 2017, but the developer plans to complete the work a quarter earlier, so the advertisement indicates the 4th quarter of 2016. In equity participation agreements, the deadline for handing over the keys is specified before June 30, 2017.
The pace of construction so far does not leave any doubt that the houses will be completed on time. Construction began in September 2014 and has made significant progress since then. Now they are already pouring a monolith of 4-8 floors and have begun bricklaying the outer walls.
In order to visit the sales office and look at the construction site, I had to walk more than 3 kilometers, and this is taking into account that I was returning back to the metro by minibus. It didn’t make much sense to take a minibus to the sales office, since the dirtiest section of the road would still have to be walked.
To get to the office, you need to exit the metro and go left along the heating main, and then go right along the Ring Road. Over time, a new road will be built there, closer to the houses, it will be called Okhtinskaya Alley. In the meantime, to get to the office, you have to pretty much mix the dirt, and the path along the narrow sidewalk along the endless stream of cars cannot be called pleasant.
But st. Shuvalov has already been asphalted and put in full order, so if you don’t go to the Polis Group office, you can easily get from the Devyatkino metro station by minibus No. 2a to the GreenLandia residential complex and then go along the street. Shuvalov to the very construction of the residential complex "Colors of Summer". In this case, you can stay clean, because st. Shuvalov was paved up to the residential complex "Colors of Summer".
For those who like walking and are not afraid to get their shoes dirty, there is another way: it is shorter, and you can walk from the metro to the new building in 10-15 minutes. To do this, after leaving the metro, go to the right along the future Baltic Aviators Avenue, which so far looks like a dirt road.
Then turn to the Three Whales residential complex and walk along the construction fence of the Leader Group company, and in front of the Okhtinskaya Duga residential complex turn left, onto the future Petrovsky Boulevard. Now it is a very dirty dirt road, but in dry weather it is quite possible to get quite close to the Paints of Summer residential complex along it.
In addition, in the near future the residential complex "Constellation" will be populated, which is just located on the corner of Petrovsky Boulevard and st. Shuvalov, which means that the road will be put in order.
I want to warn those wishing to go to the new building along Mendeleev Boulevard. This path would have been optimal if at the very end of the boulevard it had not been blocked by a construction fence from Arsenal Real Estate. Unfortunately, at least until the 1st quarter of 2016, until the Arsenal Real Estate company opens the passage through the Solnechny residential complex, it will not be possible to use this road.
This causes great inconvenience to residents of the commissioned buildings of the GreenLandia and My City residential complexes, who are forced to make their way to the metro bypassing along an unimproved road. But residents of the residential complex "Colors of Summer" will no longer face such problems.
Transport accessibility - 5 out of 10 points
Therefore, now I can’t highly appreciate the road to the new building, although by the time the Colors of Summer residential complex is settled, the path to the metro will be fully landscaped and will take 10-15 minutes, and those for whom this is a long time will be able to use the minibus.
Social and cultural life
Those who decide to buy an apartment in new territories built from scratch, as a rule, are forced to put up with inconveniences for the first time not only because of the undeveloped environment and roads, but also because of the backlog in infrastructure development.
It cannot be said that this problem will bypass the residents of the Paints of Summer residential complex, but by the end of 2016, a fair number of houses will already be occupied in the neighborhood and some infrastructure facilities will be built.
In the residential complex "GreenLandiya", which is being built in the neighborhood by Setl City, there will be 6 kindergartens (two of them in 2015) and one school (it should be completed in the III quarter of 2017). Even earlier, by the end of 2015, Polis Group promises to build a school within the residential complex "My City".
LCD "My City" also includes 4 kindergartens, one of them has already been built. Five kindergartens are being built by Arsenal-Nedvizhimost in their residential complexes"Solnechny" and "You Peter", the first kindergarten should be completed by the end of 2015.
One kindergarten for 125 children is provided in the Colors of Summer residential complex itself, it will be attached to building 2, playgrounds and a zone with exercise equipment will be improved nearby.
Will all these children's institutions be able to cover the needs of a growing microdistrict? I think not in the coming years. The pace of new housing construction is definitely outpacing the opening of schools and kindergartens, even if the developers build everything on time. Besides, enough a large number of nearby new buildings do not provide for any social facilities at all.
So far, nothing has been heard about the construction of a polyclinic, but the center in the GreenLandia residential complex will be a medical center, and a built-in outpatient clinic will be built in the My City residential complex. Sports and fitness complexes will also be built within the framework of both projects.
Two shopping centers are envisaged by the Victoria residential complex construction project (it is located just on the way from the metro to the Kraski Leta residential complex), the first of them will be completed this year. A kindergarten will also be built in this new building, however, only in 2018.
Infrastructure - 6 out of 10 points
Almost in all neighboring new buildings, not excluding the residential complex "Colors of Summer", commercial premises are provided on the first floors. So, it looks like new settlers will have no problems with shopping.
Summary
Despite the fact that the project is at the very beginning, there are big doubts about its investment attractiveness, since both the competition from the surrounding new buildings and the price level at the start of sales are high.
For your own living, this complex can also be recommended only with reservations: if you are not embarrassed by the lack of parking, an open courtyard area, and most importantly, the predominance of studios and a large number of neighbors on the floor.
Otherwise, everything is fine: the developer is reliable, the sales scheme is legal, the construction technology is solid, the layouts are comfortable. As a result, LCD "Colors of Summer" gets "7" points from me.
Daria Lapatukhina
Publication date May 13, 2015Polis Group- the developer is stable. The company keeps high score"BUT". Project "Colors of Summer" the company implements very confidently. In the year that has passed since the publication of the last opinion, the list of completed buildings has been replenished with six more. Most of the residential complex has already been built. Judging by the Internet forums of equity holders, there are no serious complaints about the quality of the houses built and the apartments transferred. Working moments that are solved in the usual way. As for the prospects for commissioning the remaining houses, the 12th building is practically ready as of mid-March. There is not much time left before the end of the quarter, so it is not clear whether the developer will have time to get permission for commissioning on time. It is possible that the procedure will take a little longer. In any case, the receipt of keys by apartment buyers in the second or third quarter of this year looks quite real. As for buildings 13, 14, 15, which belong to the last stage, the situation for them is as follows. In mid-March, the last floors of the monolithic frame of houses are being erected. At the same time, the laying of external walls is underway, and double-glazed windows have begun to be installed. The readiness of all three buildings does not yet exceed 50%. There is still more than a year before the commissioning of these houses. At the moment, everything looks quite real.
The built hulls look nice. The landscaping is also at a good level. Petrovsky Boulevard already looks like a well-formed city street. So we are not talking about life in Spartan conditions, surrounded by construction sites - this part of the Western is already more or less inhabited. Although, of course, the infrastructure has not yet been fully developed here, there are not enough social facilities. It is positive in this sense that a school is being built within the framework of the LCD. The building itself has already been erected. Remained facade and interior work. They will probably finish by the end of the year, and in 2020 the school should open for students.
In previous opinions of the portal, we have already assessed the strengths and weaknesses of the project. Significant changes last year didn't bring. But there are some developments in terms of transport. This spring, builders will start laying asphalt at the Ring Road junction, which is under construction, from where there will be an exit to Zapadnoye Murino. The project is scheduled to be handed over in mid-2020. If there are no delays, then the new settlers of the last stage of the "Colors of Summer" will immediately be able to use a more comfortable exit to the Ring Road.
Sales in the residential complex are very active, since the prices are adequate, the layouts are not bad, and the reliability is at a high level. At the moment, only 85 apartments remain available - a small percentage of the total supply in Colors of Summer. There are a lot of new buildings in Murino, so there is no shortage of alternative options. True, not all nearby new buildings are problem-free. For example, for the neighboring object of "Petrostroy" ("B") - residential complex and residential complex, the deadlines have been postponed. The situation is similar for residential complexes and residential complexes that are building (rating "B"). The residential complex under construction (rating "A +") is more reliable - this object is included in, as well as commissioned residential complexes from Setl City (rating "A +") and residential complexes from (rating "A-"), etc.
Opinion, February 2018 February 16, 2018
The pros and cons of the residential complex are described in detail by us in the previous opinions of the portal. To the above, we add that in October last year, a passage was opened under the Ring Road from the western one, after which the transport situation here became somewhat easier (the entire flow stopped closing on Shosseynaya Street in Bugry). The construction of a transport interchange has been announced, although the exact dates have not yet been specified.
According to market experts, LCD "Colors of Summer" is one of the ten most attractive in the Murinsk location - this is evidenced by. The residential complex seems to be a fairly reliable facility, which is not least due to the reputation of the company Polis Group having a high "A" score in . At the beginning of February 2018, the first five buildings of the Colors of Summer residential complex were put into operation. As for the rest, building No. 6 gives the impression of a practically finished house, interior work is underway; building No. 7 has been built, but the facade and interior work has not yet been completed - the overall readiness is estimated at 60%; the same can be said about buildings No. 8 and No. 10, the readiness of which is 62%. The situation is similar for building No. 11, which is 55% ready. But the ninth building outwardly looks almost complete, although the work there has not yet been completed either - the overall readiness of the house is estimated at 70%. The construction of all these houses should be completed in the first or second quarters of this year. Considering the volume of what has already been done, the deadline is real, but a slight postponement can still be allowed. Building No. 12 is already 68% ready, but it will be commissioned only in the first quarter of 2019, so there are no questions here. As for the houses, the delivery of which is scheduled for 2020, building 13 is at the stage of foundation work. Buildings 14 and 15 are at the initial stage. But there are still two years left, so there is no reason for concern. To summarize: the construction of a residential complex is proceeding dynamically, investments in this facility look quite reliable, the price is average by the standards of the location.
Apartments in "Colors of Summer" are in demand. At the beginning of February 2018, in the first five houses commissioned, the only “odnushka” on assignment remained for sale. In buildings 6 to 11, which are being rented out this year, less than 40 apartments are available in total. The real choice is only in buildings No. 12 and 13 (more than 280 apartments in total).
Western Murino is a huge residential area and there are many alternative options. Among the new buildings located in the immediate vicinity of the "Colors of Summer", one can name residential complexes ("A +") (already commissioned) and (included in), as well as from (rating "A +", there are slight postponements), complexes and " Territory" from (rating "B-"), (rating "B"), etc.
November 21, 2016
There are no completed queues in the Colors of Summer residential complex yet. The first five buildings should be put into operation in the 1st quarter of 2017. There are still apartments for sale, mostly studios on assignment. Prices are quite competitive, the developer already has completed properties - so it is likely that even these apartments will not be left closer to the deadline. Although the commissioning of houses did not always go smoothly. If we evaluate the reputation of the developer, then, for example, house 5 was handed over on time, but with imperfections, house 4 was fully finished, but, according to residents in social networks, with a delay in the delivery of keys. True, it would be fair to admit that, alas, in the realities of the Russian construction market, delays of up to a year are perceived as something ordinary.
Of the problems faced by motorists already living in the area (in neighboring new buildings) are traffic jams at the entrance and exit from the quarter. According to some reviews, leaving the microdistrict can take up to 30 minutes.
The situation with the delay of infrastructure facilities in new areas of mass construction is always acute. Therefore, the opening in the fall of 2016 secondary school in the area is very positive news.
Also pleasing are the plans to build a new interchange with the Ring Road in. It is planned to start work in the first months of 2017, to hand over the facility in 2018.
Of the alternative options for buying housing here, one can name, and many others - the competition in the location is high.
September 09, 2015
Forerunner LCD "Colors of Summer" steel - an economy class complex, the first stage of which is commissioned in the III quarter of 2014. Thus, construction company, in this case, its own competitor. Indeed, in construction LCD "Colors of Summer" brick and aerated concrete are used, which favorably distinguishes it from the panel residential complex "My City" and brings the class of the complex closer to "comfort". But this is only from the point of view of construction technology. If we consider the plans in "Colors of summer", then we must admit that they are quite consistent with the economy class in its classical sense. All apartments are very compact. Minimum total area. The hallways are small, the kitchens are small, in no case suitable for the role of dining rooms. Unless we consider individual layout options, when, for example, the kitchen in the "kopeck piece" is combined with one of the rooms, which turns such an apartment into a good "one-room apartment". Of the advantages, one can note the presence of spacious balconies in almost every apartment.
Another important point is also important. According to the typical floor plan, over ten apartments and studios are located on the site. They have two elevators. Given that the residential complex is multi-storey, the load on the elevators will be large. It is safe to predict "traffic jams" in the morning, when most residents will leave the house and in the evenings, when they will return.
It is also worth taking into account that the complex is dominated by studios and one-bedroom apartments. As practice shows, often people buy such housing with the aim of investing funds for further resale or rental. Often young people live in studios and odnushki. And, as they say, you can’t erase words from a song: young people keep order in the entrance less and are often prone to noisy parties with music until late, which interferes with calmer neighbors.
Thus, evaluating the flats, we can recommend this residential complex primarily to young people, especially since the prices here are very affordable. For pensioners, it can be noisy here, and for families with children, the apartments are small in size.
In addition, social infrastructure is very important for both the elderly and families. And while things are not going with her here in the best way. The number of construction projects in Devyatkino is constantly growing, but the pace of infrastructure development is lagging behind. All the projects that are being implemented here are large-scale in terms of area, they are rented out in queues, and, accordingly, the population growth is quite tangible, and there is not enough infrastructure. And appeals to social institutions in St. Petersburg are sometimes hindered by “regional registration”, since new buildings are located in the Vsevolozhsk district of the region. We must pay tribute to the authorities, for some time now they have obliged developers to commission social facilities along with residential buildings, so in the future the situation in Murino will stabilize. But for now, all that remains is to wait.
With regard to the transport situation, up to "Colors of Summer" It's not close, but you can walk. This is, of course, the most important plus of the residential complex. As for motor transport, here everything rests on the situation on the Toksovskoye highway. Traffic jams have long been a common occurrence on this highway on the outskirts of the Ring Road junction. So far there is no solution to the problem. There is hope that the situation will improve after the commissioning of a toll bypass road around Murino. However, let's be objective: similar difficulties now, in most popular locations close to the city limits.
The flow of buyers, despite the infrastructural difficulties, does not dry out, the area is in demand, and LCD "Colors of Summer" will surely find its customers. Especially given that the company Polis Group a good reputation in the market (the developer is very reliable), favorable conditions for the purchase of housing and a dynamic system of discounts and bonuses. The advantage of Murino himself is that the further new construction projects go, the closer they are to an ecologically clean forest belt and reservoirs where you can get out on the weekends. Up to large shopping centers within the ring road, you can also get there quickly (if there are no traffic jams, of course).
The competition in the market of housing under construction in Murino - Devyatkino is very high. In the neighborhood with "Colors of Summer" apartments are being sold in residential complexes, "Constellation", "Swallow", "Alphabet", and many others. If we consider other metro stations, then we can call, for example, y.
Residential complex Paints of summer is being built in Murino, Vsevolozhsky district, on Petrovsky Boulevard. Project Builder - construction company Polis Group.
Transport issue in Kraski Leta Residential Complex:nearest metro station Devyatkino located about 20 minutes walk from the new building. Near the new building there is an exit to the Ring Road.
ZhK Paints of summer consists of 5 residential apartment buildings. The project provides for studio apartments, 1-2-3-room apartments, a kindergarten, non-residential premises for commercial use, landscaping.
In the area of the new building Kraski Leta public and private kindergartens, general education and music schools, clinics, shops, sport Club with pools. Not far from the Kraski leta residential complex are the Mega and Severny Mall shopping malls.
How to buy an apartment in Kraski Leta Residential Complex: directly from the construction company Polis or from a project partner Petersburg Real Estate. The minimum cost of an apartment in a new building is 1.420 million rubles.
News
June 2015: sales are open in building No. 4 of the Kraski Leta residential complex. This is a one-section building with 19 floors, which will house apartments from compact studios of 20 square meters to three-room small sizes of 54 square meters. As in all other buildings of the Kraski Leto new building, on the ground floor there will be rooms for wheelchairs and outlets. Completion of the construction of building No. 4 put on the market is expected at the end of 2016.
October 2015: sales began in building No. 3 of the new Kraski Leta complex. The building will be single-section, height - 19 floors, as in the entire residential area. Apartments in a new building are rented with improved finishes. Completion of construction is scheduled for the end of 2016.
August 2017: the developer received permission to commission the houses of the first stage of construction - these are buildings 1, 2 3, 4 and 5. Recall that the original planned date was December 2016.
October 2017: began selling housing in the fifth phase of the residential complex "Colors of Summer" under construction. It includes three residential buildings and a school for 1175 students. The planned completion date is the 2nd quarter of 2020. For sale - studios, 1-, 2-, 3-room, both classic and "euro"; with preparation for fine finishing or with full finishing.
April 2018: building 6 of the Kraski leta residential complex was put into operation.
August 2018: at the end of July, the developer published an information letter on the postponement of the deadline for the completion of buildings 7-11 to the 3rd quarter of 2018, while key handover time remains the same — Q4 2018.
October 2018 : no information about obtaining RVE for buildings 7-11. According to Yandex.Real Estate, the completion date for Stage 3 is scheduled for the end of the year.
December 2018: Buildings 7-11 (Phase 3) received AIA.
February 2019: "Polis Group" put into operation the 3rd stage of the residential complex "Colors of Summer". The structure of the delivered queue includes five residential buildings (houses from 7 to 11 with a variable number of storeys of 13-20 floors) with a total footage of more than 65 thousand "squares". The number of apartments in the queue is 2421.
May 2019: during the 1st quarter of 2019, house 12 (4th stage of the residential complex) was not commissioned. On the site of the new building, it is reported that the installation of stained-glass structures and the acceptance of applications for finishing have been completed. Construction is nearing completion. New deadline 2nd quarter 2019.
June 2019: RVE received for the 4th stage of the residential complex (building 12). These are 5 buildings for 2263 apartments. The occupancy begins. Phase 5 is currently under construction. These are houses 13, 14 and 15. They should be handed over in the 2nd quarter of 2020.
- RESIDENTIAL COMPLEX "KRASKI SUMMER" In the north-eastern suburb of St. Petersburg, Murino, a residential complex "Colors of Summer" is being built. It consists of 15 houses with a height of 19 floors. The first few stages have already been commissioned, the completion of construction is scheduled for 2020. The developer of the complex is the Polis Group company.
- Three kindergartens and a school In addition to residential buildings, Colors of Summer will have three kindergartens with a capacity of 100 people each, as well as a school for more than 1,000 children. A sports and health complex will open in one of the houses. On the first floors of most buildings there are rooms for commercial facilities. Near each house there will be playgrounds, outdoor exercise equipment complexes and much more.
- Positive reviews from the first settlers The first new settlers have already moved into apartments and generously share their feedback about them. Many note high level construction quality: the houses are warm, there are no drafts. Finishing work was also carried out carefully - the walls and floor are even, nothing needs to be changed. And if there are small flaws - the developer promptly eliminates them.
- Huge selection apartments The layouts of the residential complex "Colors of Summer" are divided into two categories: traditional and "euro". The first in most - they have compact kitchens and large bedrooms. In the rest, the kitchen is combined with the living room. Euro-plans are found in two- and three-room apartments with the maximum area. Most of the options in this new building are studios and one-bedroom apartments. Each has a balcony or loggia, there are niches for storing things.
- Punctual builder Polis Group is a relatively young construction company: it has been operating in the real estate market of St. Petersburg since 2010. During this time, she managed to build more than 40 houses in the Northern capital and its environs. All new buildings of Polis Group were commissioned on time. On the website of the Residential Complex "Colors of Summer" it is said that the mission of the company is to create the most comfortable space for living.
- developing area Residential complex "Colors of Summer" is being built in the suburb of St. Petersburg Murino, which is rapidly turning into a new area of the metropolis. Already, there are six kindergartens (five private and one municipal) within a ten-minute walk from the complex. The nearest school is in the next block. Near the complex there is a confectionery, a pizzeria, several supermarkets.
- Close to metro, convenient way to the city LCD "Colors of Summer" is being built within walking distance from the metro station "Devyatkino". The station can be reached on foot in 25 minutes. There is also a railway platform: by train you can get to the Moscow railway station in half an hour. You can get into the city bypassing the Ring Road - along the Okhtinsky Alley and then along Upper Street.
- Available payment options The leading banks of St. Petersburg offer to buy an apartment in the residential complex "Colors of Summer" with the help of a mortgage: Sberbank, VTB, Vozrozhdenie, Otkritie and others. Polis Group provides installment plans for apartments in houses under construction, and also accepts all types of city and federal subsidies for payment.
- You can order a clean finish In the LCD "Colors of Summer" the price of the apartment does not include fine finishing. But it can be ordered additionally: "Policy Group" guarantees clear deadlines and low cost of finishing work. Their list includes: laying laminate flooring, installing doors and windows, wallpapering walls, painting ceilings, installing plumbing and much more.